As sections of pipe are assembled and welded together to create a pipeline, several markings are placed on the pipe to document conditions and inspections of the pipe.
Checked and Okay-ed on March 26th

Pipe coating needs attention.

Sign-off of completed steps (?)




No comments:
Post a Comment