Pipeline Construction
As an excavator hauls the last load of timber mats to the access road, the first frac tank arrives for set up for the hydrostatic testing of the Wesauking Pipeline.
By the end of the day, seven frac tanks had been moved into position at the valve site.
A check valve and shut off valve on the 12 inch valve assembly have been removed and the pipes capped.