
With the topsoil graded the excavator works to remove the timber mats from the wetland crossing.

At the valve assembly site, an excavator operator works to install a culvert pipe for the access road.

Deer are grazing near the valve assembly while an excavator and dozer work on the access road less than a hundred yards away.

Another deer moves through the brush while a dozer works on the pipeline right-of-way.

At the end of the day, a young cottontail rabbit checks out the 24 inch "pig launcher"

No comments:
Post a Comment