Dozers worked on cutting a trench at the base of the pad slope.

Checking the trench.

The newly moved dirt is rolled to compact it and with rain in the forecast, seal the surface to reduce erosion.

View of the pad area from the stream crossing.

More rock hauled to the site ...

The loads of rock hauled to the site have taken a toll on Joyce Road (and some neighbors lawns). The Vestal Asphalt crew (working for Rome Township) closed a section of Joyce Road today to stabilize some of the damage.