
The concrete, rebar and pipe from the cellars is ready to be removed from the pad.

The rebuilding of the side hill on the east slope of the pad is now up to the pad entrance and the old pad area is getting smaller.

A view looking to the southeast corner of the site where the original grade of the hillside has been restored and some of the topsoil from the stockpile has been spread.

No comments:
Post a Comment