The pipeline trench has been dug and sand bags placed in the trench on the north side of Bliss Road.

Yellow mating (cushioning) has been placed around the pipe. View of the pipeline looking north from the top of the hill at Jason and Mary Abell's.

View of the pipeline on north side of hill. The Hayward well pad is across the valley.

Wesauking Pipeline
I'm not sure if the local deer will obey the sign.

The trees and stumps have been removed and chipped along the wooded section of the Wesauking pipeline on our cabin property. A CAT D6 dozer completes the grading near the wetlands crossing. A view of the pipeline route looking west toward our barn.

View of the wetlands crossing looking east.

View of timber mating crossing the wetlands area.

No comments:
Post a Comment