Some of the drainage problems were cause by a plugged driveway culvert which blocked the ditch from draining.

With the plugged culvert replaced, the ditches on both sides were deepened and 4 inch drain lines installed below several feet of crushed stone. While the surface structure of the ditch will carry away the quick/large volume of water created by heavy rains and spring thaw, the 4 inch drain line and stone base will dry up the road base and straighten the road.

The finished drainage improvements. Great job by the township road crew.