08 February 2012

Pipeline Construction

A truck load of pipe for the section of the Wilmot Pipeline on our property is transported to the construction site on the timber plank access road.



Sections of pipe are positioned along the pipeline route. This section of the pipeline is just south of our cabin.




Pipe near the intersection of the Wilmot and Wesauking pipelines on our property. There will be a valve at the pipeline intersection, located in the field next to the woods.


A pipe bender.


05 February 2012

Pipeline Construction

The clearing and grading of the Wilmot pipeline on our cabin property is nearly complete as an excavator moves dirt next to the wetlands by the cabin.



The timber mating is in place at the wetlands section through our woods.


View of the pipeline route through our woods, looking south.


The pipeline grading has now moved to the section between the cabin driveway and Bliss Road. Th Zion pipeline will connect into the Wilmot pipeline along this section.


View of our cabin and pipeline equipment from Joyce Road.

01 February 2012

Pipeline Construction

Work continues on placing timber mats through the wooded area of the pipeline route on our property.


This wooded area has several sections of wetlands and needed lots of timber mating.


Working through the wet spots.


Stockpile of timber mats.


A CAT-D8 and an excavator moving dirt.

31 January 2012

Pipeline Construction

The timber mating on the pipeline access road now allows the truckloads of timber mates to be delivered closer to where they are needed on the pipeline route.


Unloading the timber mates.


With the warm/wet weather they will need a lot of timber mates.


Near our woods they are placing the timber mates in the "pullback" area for welding pipe.


Mud in the wooded section of the pipeline route.


Excavators working in the wooded section.


Top soil being cleared at Jason and Mary Abell's

30 January 2012

Pipeline Construction

Timber mats have been placed on the pipeline access road from Joyce Road to the pipeline right-of-way near our cabin.



Timber matting has also been placed in the cabin driveway where the pipeline will cross our road.



Installing timber mats in the pipeline route.



The timber mats on the access road will now allow "wheeled" equipment, such as a forklift, to move supplies to the pipeline route.



Culvert pipe being transported to the pipeline route.


A CAT D8 dozer moving dirt on the pipeline right-of-way on the south end of our property.


28 January 2012

Pipeline Construction

The warm/wet Winter weather is creating some additional problems for the pipeline construction ... MUD!

The "Ditch Witch" used for installing silt fence has become another victim of our clay soil.


An access road to the pipeline is being constructed next to the driveway to our cabin. This temporary access road is being constructed with planking placed over the muddy soil.



A CAT-D8 dozer clears the topsoil from the pipeline right-of-way near our cabin.



Topsoil removal near the wetlands crossing by the cabin. Towner Hill in the background with the TREAT well pad (about 2 miles away) above and to the right of the dozer.



A CAT-D8 clearing topsoil. The pipeline route across Jason and Mary Abell's property can be seen in the background.

27 January 2012

On Vacation

You may have noticed the lack of activity on this blog for the last couple of weeks. We've been on vacation in Ecuador. Check out our travel blog:

Ecuador & Amazon Adventure







11 January 2012

Pipeline Construction

Construction equipment for the Wilmot pipeline is active again on the cabin property. This photo shows an excavator moving supplies along the pipeline route at the wetlands crossing near our cabin.



Silt fence is being install along the pipeline route through the cleared section of our woods.



Silt fencing to be installed near the wetlands crossing below our pond.



Since this pipeline crosses both State Route 467 and Johnson Creek near Allis Hollow Equipment, this section of the pipeline will be bored out. At the top of the hill, in Sink's field, the silt fence has been installed at the exit location for a pipeline bore.



The pipeline boring will start on the south side of Johnson Creek, at the base of Harmony Hill and will proceed north under the creek and SR-467 and continue underground to Sink's field at the top of the hill. This pipeline bore is 1/2 mile long and when the boring is complete a 24 inch gas pipeline will be pulled back through the bore hole.

The following photo is a view of the pipeline route on Harmony Hill and shows construction equipment at the bottom of the hill near the location of the starting point for the pipeline boring.




This photo shows the pipeline boring equipment in the field next to Raglan Road (T738). The boring operation is being done by Carson & Roberts of Lafayette, NJ.



A Google Map satellite view showing the pipeline route in yellow and pipeline bore section in red.
Google Map link

31 December 2011

Happy New Year

As the sun sets on 2011 have a happy New Year

28 December 2011

Going... Going... Gone!!!

Over the past month the barn at Jason and Mary Abell's has gone through a dismantling to make room for a new pole barn.

Start of barn board removal



Barn boards removed



Remove structural support and collapse barn.

20 December 2011

MEMORIAL BENEFIT for Karson Riley Hopkins



MEMORIAL BENEFIT
for
Karson Riley Hopkins

Son of SFC Brian Hopkins (Retired) & Atisha Hopkins
of Rome, PA

Grandson of Dave & Judy Hopkins
of Wyalusing, PA

Karson fought a 2-year battle with Neuroblastoma Cancer. He turned 3 on November 7th. He passed away on November 16th.
Please come and support this family.

Spaghetti Dinner and Live Entertainment
Saturday, January 14, 2012
Wyalusing American Legion
2:00pm-6:00pm

Raffles, Silent Auctions, Chinese
Auctions, Live Entertainment

Admission: $3 at door or cost of meal

Cost of Meal: $7 adults, $5 ages 6-12, FREE for 5 & under,
TAKE OUT orders available

All Proceeds will be donated to the Hopkins family.

Contributions may also be made at any P&G Federal Credit Union under Memorial Fund for Karson Hopkins, c/o Atisha Hopkins.

For more information or to donate please call:
Crystal & Dave Baltrusaitis 570-833-0831
Danielle & Jonah Eberlin 570-833-4539
Deanna Vaskas 570-746-9469

18 December 2011

Pipeline Progress

Over the past couple of weeks, crews have been working on clearing the right of way for the Wilmot pipeline. Trees along the pipeline route were cut last March and now the crews are clearing and chipping the trees.

The following photo shows a section of the woods at our cabin property where the crew is in the process of removing tree stumps and stacking wood to be chipped.



This is the same section of the woods after the clearing in complete.


05 December 2011

Smile, You're on Candid Camera

I take a lot of pictures and sometimes people aren't aware I've taken their picture. I just found a picture of me on the internet, on Google Map!

The Google Map Satellite image for our neighborhood was updated with a more current, high resolution image. The resolution is so good I was able to find myself working at our cabin property.

When I started looking at objects in the lawn at our cabin it was easy to pick out my John Deere tractor and a hay bale. I soon remembered the hay bale was only in the lawn for one day in early October when I reseeded the lawn and I was there the whole time. On closer inspection I was able to locate myself working on the lawn. (Click on photo for enlarged view)


This view shows the cabin property, our barn property, the reclaimed well pad area, access road, driveway to the cabin and even freshly mowed areas.



Since this satellite view of Rome was taken after the recent flooding it also show some of the flood damage along Wysox Creek.