View of the back side of the house in the morning.

A crane was brought in to lift a heavy steel I-beam and position it in the garage area.

Setting the I-beam in place. This I-beam spans the length of the garage area and will support the second floor living space over the garage.

With the I-beam in place the crew installed the floor joists for the second floor. The garage floor needs to be filled with compacted stone before a concrete floor is poured.

A view of the inside with some of the interior walls installed.

A view looking out the back of the house.

A view of the back of the house after 3 days of framing.