By 11:00PM the temperature was in the teens and a large section of the roof on the back side (sunny side) of the house was shingled.

By 4:00PM the crew was attaching the ridge vent on sections of the house.

As the afternoon sun started to set, the temperature was in the mid-20's and the crew had completed large sections of the roof.