By 1:00PM the temporary stairs were installed to make access the second floor easier.

Interior walls on the second floor were going in but there was still some open space at 1:00PM.

By 4:30PM most of the second floor walls were in place.

The room layouts are starting to take shape as the tub and shower units are positioned in the rough openings.

A stack of wall studs in one of the front bedrooms dwindles as the new walls go up.

The windows are starting to go in.