
A view of the back side of the house showing the windows, which had been added, along with the ledger board for a deck (a project for Brian to work on).

All the interior walls have been installed and metal brackets are attached to secure the walls to the roof rafters.

Other than installing the entrance doors, which are scheduled to be installed later, the crew was done with all of their work by 2:30PM on the seventh day of framing.

A view of the temporary stairs to the second floor from the front entrance .

A view looking from the den to the living room.

The second floor master bedroom with walk-in closet.

Master bathroom.

No comments:
Post a Comment