29 May 2014

Hopkins' New House

The concrete crew was at Brian & Tish Hopkins' new house to pour the garage and porch floors.



Garage floor.


Front porch.

25 May 2014

Chuck & Nikki's Wedding

On May 25th, 2014, our son Robert C. Beebe Jr. (Chuck) and Nicole Carpenter (Nikki) were married on a hilltop vista on our property. Both Chuck and Nikki are professional meteorologists and must have done some long range planning over a year ago to select this perfect day for a wedding.(photo by Michael Gard)
 


Nikki and Chuck sharing their wedding vows.



Planting an oak tree at their wedding site.



Nikki in a field next to the wedding site. (photo by Mark Davis)



Following the wedding ceremony, Chuck and Nikki traveled to the reception site at our barn on a John Deere "A" tractor.



The new Mr. & Mrs. Beebe.



Chuck and Nikki greeted at the reception by Chuck's Grandfather.



Chuck and Nikki with Chuck's 98 year old grandfather, Henry Beebe.



Chuck and Nikki's  first dance as husband and wife.



Matt Beebe, Best Man and brother of the groom, toasting the new couple.



Time to party in the courtyard of the barn.




 The wedding celebration lasted into the evening  and   Nikki, accompanied by her three dogs, had some time to sit and talk with her aunt.  Tim Bell, a member of the wedding party, checked to see how the refreshments were holding out. (photo by Mark Davis)



17 May 2014

At the ends of a Rainbow

The saturated ground was stating to dry out from yesterday's drenching rain and it was nice to see this double rainbow over the neighborhood.

06 May 2014

Hopkins' New House

With the warmer/dryer weather, a crew was able to place the walls for the front porch foundation on Brian & Tish Hopkins' new house.



The front porch wall was back-filled, on both sides, and is almost ready for a concrete top.

01 May 2014

Hopkins' New House

The installation of the ceramic tile in Brian & Tish Hopkins' new house continued as a worker cuts pieces of tile to size.



Finished ceramic tile in the master bath.



More supplies arrived and are stored in the garage area waiting for installation. A shipment of interior doors.



Molding and trim.