21 July 2010

EASTHILL site survey

Greenway Engineering was in the neighborhood today to do the initial survey of the proposed EASTHILL (EAW37) drill site. This survey will be done with a GPS mapping system to create a 3D map of the property for use in creating a well pad layout. Two wooden survey stakes and metal pins were placed along Joyce Road next to our cabin property as reference markers for other surveys done on the EASTHILL drill site.

No comments: