07 July 2012

Pipeline Construction

After several days of equipment problems the seeding crew was able to apply the hay mulch to the pipeline right-of-way.



Large round bales of hay are chopped/shredded for the mulch. It doesn't take long for the machine to use a bale of hay.


The bales of hay are loaded after the outer rapper is removed.




With the current dry conditions, this is a very dusty/dirty job.




No comments: