14 February 2012

Pipeline Construction

The welding of the 20 inch pipe on our cabin property is nearly complete except for the sections of the pipeline route that cross the wetlands and our driveway.

A view of the pipeline looking southeast from the "food plot" near the cabin. In the background, to the right of the main section of pipeline, is the section of pipe for the wetland crossing.



All welds along the pipeline were inspected and repaired if needed.


Once the welded joint passes inspection the area is sandblasted and a protective coating is applied.


Other messages on the pipe.