Wesauking Pipeline

Work started today on the access road to the east end of the Wesauking Pipeline where it intersects with the Wilmot Pipeline on our property.

A CAT D6 dozer is grading back the topsoil in the road right-of-way. In the background are 4 excavators parked on the Wilmot Pipeline near our cabin (far right in photo).



The Wesauking Pipeline access road will connect to the current access road at the stream crossing.


An excavator works at the east end of the Wesauking Pipeline where the access road and Wilmot Pipeline meet. In the background (across the valley) is our barn property.



A view from the Wesauking Pipeline looking east at the intersection with the Wilmot Pipeline. The green pipe of the Wilmot Pipeline can be seen in the background along with the CAT D6 dozer working on the access road. There will be a valve site installed at the location where the two pipelines connect.



Wilmot Pipeline
No activity at the Wilmot Pipeline today but excavators were working on the pipeline trench near the wetlands crossing (next to cabin) and will be placing the pipe in the ground soon.