07 July 2011

Well Pad Reclamation - Day 14

Last night's rain, 4/10 of an inch, helped to hold down the dust and the dirt hauling continues.



The rough grading on the south end of the site is complete.



A GPS equipped dozer spreads topsoil over the rough graded dirt. The GPS dozer smooths out the topsoil by grading backwards.


View of the access road from the northwest corner of the pad. The "Porta-John" has been moved from the pad area to the access road near the stream crossing.