09 July 2011

Well Pad Reclamation - Day 16

The east slope is nearing the original grade of the hillside as the dozer with GPS grades the freshly moved dirt.



More dirt from the bottom of the hillside is moved to the top.



With some of the rough grading complete, a dozer spreads topsoil from the stockpile.



The topsoil in the stockpile is still wet from the spring rains. With the continuing dry weather a dozer works late into the evening spreading the topsoil so it will dry out.