03 May 2011

Pad Construction - Day 35

Another dry day and the crew is grading the south slope of the pad.



Other slopes with finished grades were covered with an erosion control straw nettling.



View of a roll of straw netting.



Re-seeding crew with rolls of netting to install.



Another excavator arrived on site.


A load of large rock arriving for the pad area. Note the cloud of dust from the dry conditions.



Wide angle view of the pad area looking west from the top of the uphill (east) slope of the pad.
Click on image to enlarge the view.

No comments: