09 May 2011

Pad Construction - Day 41

A clear, dry day and work continued on the well pad. More stone was dumped on the access road from the stream crossing to the pad area.



Trucks hauling crushed stone to the pad area.



On the pad area, crushed stone was being stockpiled at the south end of the pad. Large rock is added to the pad base at the north end of the pad.



Equipment on the move to the pad area.



New silt fence is installed at the north end of the dirt stockpile.



A dozer working the dirt stockpile above the slope on the east side of the pad.



Moving the fuel tank.