10 May 2011

Pad Construction - Day 42

Greenway Engineering was at the site today surveying locations on the well pad. They set up a GPS base station along Joyce Road at a know pin location used for prior surveys of the area.



On the well pad the drilling location were marked.



Trucks continued to haul more rock to the pad area and stockpile it.



An excavator worked on the dirt stockpile at the uphill side of the site.



Silt sock inspection by one of the local residents