14 May 2011

Pad Construction - Day 46

A small crew was on site today putting the finishing touches on the pad area crushed stone.



The pad area is covered with 18 inches of crushed stone.



Another load of stone dumped.



The final layer of fine crushed stone is applied to the road.



The well permit was posted today on the bulletin board at the entrance.