30 March 2012

Pipeline Markings

As sections of pipe are assembled and welded together to create a pipeline, several markings are placed on the pipe to document conditions and inspections of the pipe.

Checked and Okay-ed on March 26th



Pipe coating needs attention.



Sign-off of completed steps (?)












No comments: