As sections of pipe are assembled and welded together to create a pipeline, several markings are placed on the pipe to document conditions and inspections of the pipe.
Checked and Okay-ed on March 26th
Pipe coating needs attention.
Sign-off of completed steps (?)
30 March 2012
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment