07 May 2011

Pad Construction - Day 39

Activity at the site picked up today as a large crew of workers were on site to replace the existing silt fence, along the downhill (west) side of the construction site, with "Super Silt Fence".



By the end of the day the new super silt fence had been installed along the downhill edge of the site.





Water tankers arrived this morning to remove the silty standing water from the pad area.


By the afternoon most of the water had been removed but the dark sky may have different plans on the water level.

2 comments:

ppsheet said...
This comment has been removed by the author.
ppsheet said...

other areas prone to soil erosion. Made from a permeable geotextile fabric, the Silt Fence is designed to trap sediment