Pipeline Construction

For the past couple of days a crew has been working on the finial stages of pipeline construction, reclamation and reseeding.

They have regraded the area around the valve assemblies and placed crushed stone under the valves.



Along the pipeline right-of-way, a dozer regrades the topsoil that was stockpiled during the clearing of the right-of-way.


A dozer and excavator work on the finial grading of the topsoil.



Regraded area of the pipeline right-of-way near our cabin and pond.