At the wetland crossing next to our pond, an excavator uses a pipe to smooths out the topsoil.
With the topsoil graded the excavator works to remove the timber mats from the wetland crossing.
At the valve assembly site, an excavator operator works to install a culvert pipe for the access road.
Deer are grazing near the valve assembly while an excavator and dozer work on the access road less than a hundred yards away.
Another deer moves through the brush while a dozer works on the pipeline right-of-way.
At the end of the day, a young cottontail rabbit checks out the 24 inch "pig launcher"
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment