The timber mats are being removed from the access road to the pipeline valve site so a permanent road can be constructed. A rock base will be added to the access road along with better drainage.
With the pipeline right-of-ways regraded and ready for seeding, timber mats were stacked wherever space could be found.
Back at the pipeline right-of-way through our woods, a deer (center of photo) walks through a section that was recently reseeded.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment