24 January 2014

Hopkins' New House - Day 7

The temperature dropped to 0 degrees F. overnight and by 10:30AM the frost was still clinging to the roof on Brian & Tish Hopkins' new house. The cold weather didn't slow the framing crew as they finished installing the window in the house.



A view of the back side of the house showing the windows, which had been added, along with the ledger board for a deck (a project for Brian to work on).



All the interior walls have been installed and metal brackets are attached to secure the walls to the roof rafters.



Other than installing the entrance doors, which are scheduled to be installed  later, the  crew was done with all of their work by 2:30PM on the seventh day of framing.



A view of the temporary stairs to the second floor from the front entrance .



A view looking from the den to the living room.



The second floor master bedroom with walk-in closet.



Master bathroom.

No comments: