09 April 2011

Pad Construction - Day 11

A second large truck arrived on the construction site today and the day shift crew was busy hauling moist dirt from the lower side of the pad area to some higher ground.




Not always a smooth ride in the truck.



Motoring up the hill with a load.



The D8 Cat continued to clear the site.



A rock layer was being placed at the north end of the site.



Still a little damp at the top of the hill and may need a little more rock.




The rock is now in place at the west (lower) side of of the pad area next to the silt sock.



Not much work has been done at the south side of the pad area near the woods.



Long range view of the pad area from the neighbor's back lawn.