23 April 2011

Pad Construction - Day 25

The dry weather didn't last long and overnight we got 1.1 inches of rain. Most of the equipment was parked on the high ground of the pad area and there wasn't much activity on the site.



Water was flowing in the ditches at the stream crossing ...



and the erosion control was working hard to keep up with the heavy rainfall ...



West slope of the pad.


Peter Crounse of Crescent Services was on site for an E&S (erosion and sediment) inspection of the site.