04 April 2011

Pad Construction - Day 6

The overnight rain and damp/cloudy day didn't mix well with the clay soil for the road base.



A continuous stream of trucks hauled crushed stone to the site for use as new road base.



Rock added to the new section of access road between the cabin driveway and the well pad.



More equipment continued to arrive at the site.





Work continued at the well pad area to install the "silt sock".



The "silt sock" is constructed on-site by filling a large fabric mesh tube with mulch made from wood chips.