27 April 2011

Pad Construction - Day 29

Another rainy night but the 3/4 of an inch of rain didn't help in drying out the site. The major activity on the site was repairing and constructing new silt sock.



A new section of silt sock was added today



Testing the silt sock.



Several truckloads of large rock arrived at the site today.



Rock stockpiled near the stream crossing.



Kyle of Crescent Services was on site for an E&S (erosion and sediment) inspection of the site.