The heavy rains of the past few days gave way to some patches of blue sky with some scattered showers during the day.
The crew was back moving dirt on the well pad.
Checking the elevation at the southwest corner of the pad.
Grading the uphill slope above the pad area.
Another crew was on site to install a "super silt fence" to help control erosion from runoff water from the pad.
Digging a trench for the new fence.
New "super silt fence" on the west (downhill) side of the pad area.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment