01 April 2011

Pad Construction - Day 3 (Mud)

Day 3 was another cold and wet day with some light snow. The activity moved to the back field pad area where brush was being ground up into wood chips with the following red vehicle.



While the site was being cleared another crew was dealing with the mud as they tried to install "silt sock" and erosion control fence.



Vehicles needed the help of a dozer to move in the mud.



Moving a truck load of wood mulch, for the "silt sock", into the pad area required a tow from a dozer...



and another tow to get the truck back out.