The welding crew attaches the alignment collar to a section of the pipeline.

The next section of pipe is placed in the alignment collar.

The two pieces of pipe are clamped into position prior to tack welding.

Welding the bottom side of the pipe joint.

Finishing the welding of the joint.

After the pipe is welded, an X-ray inspection of the welded joint is done and documented.

No comments:
Post a Comment