The welding crew continued to prepare the "pull-back" sections of the Wilmot Pipeline for leak testing. The team welding an end on the pipeline section.
Close-up of the special torch used to cut the pipe.
A couple of the ends welded on the pipeline for testing.
Before the pipeline ends were welded on, a pipeline "pig" was inserted into each section of pipe. A pipeline "pig" is a device that is moved through the pipeline by the flow of gas or fluids.
A photo of one of the "pigs" used for leak testing.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment