02 May 2012

Pipeline Construction

The welders were back in the trench today welding connections to tie in valves and the two pipelines.



This fitting will tie the smaller Wesauking Pipeline into the Wilmot Pipeline.



The 20 inch "Pig Launcher" for the north end of the Wilmot Pipeline was place in position today and needs to be connected to the pipeline. A 24 inch "Pig Launcher" will be installed to handle the south end of the Wilmot Pipeline.



Getting another section of pipe ready for welding.