20 May 2012

Pipeline Construction

The hydrostatic test of the 24 inch pipeline was successful and the control/monitoring truck is gone. The finial test pressure of 2,100 PSI was reached about midnight and held for 8 hours without leaks.



With this section of the 24 inch pipeline complete the next job is to transfer the water from the 24 inch pipeline back to the 20 inch pipeline using a smaller flexible hose. The water transfer will take 3 to 4 hours.