Pipeline Construction

It may be a holiday but some people still have to work. The frac tanks are installed and need to be filled with water before the hydrostatic test of the Wesauking Pipeline can begin.



The water is being hauled from Towanda and it should take about 35 truck loads to fill the frac tanks.