With the frac tanks full of water, more equipment was brought in for the hydrostatic test of the Wesauking Pipeline.
Workers prepare a large pump to transfer water from the frac tanks to the pipeline.
A large supply of foam "pigs" to clean out the pipeline.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment